Industrial Pallet Racks in Burlington, KY
Industrial pallet racks in Burlington, KY mostly go into brand-new space. Lakeland Logistics Center and Cincinnati Logistics Park - Airport West offer 32–36 ft clear first-generation buildings.
New suites start empty, so pallet rack systems get planned from a blank floor. That is the best time to get the layout right.
Frames, Beams and Decking for First-Generation Space
Tall rows need taller uprights, and frame ratings fall as the unsupported span between beams grows. We set beam spacing to protect frame capacity at full height.
Wire decking goes in wherever loads might not span both beams. Row spacers tie back-to-back runs together. End-of-aisle guards protect frames where trucks turn. All of it appears on the itemized quote, line by line.
Fitting Out a New 36 ft Clear Suite
Lakeland Logistics Center on Lakeland Park Dr runs 36 ft clear. Its buildings divide into suites of about 70,000 SF. KY-237 reaches I-275, and KY-18 runs to I-75.
A blank 36 ft floor invites tall selective rows. Six or more beam levels are common with standard loads. Frame capacity drops as beam spacing grows, so we spec frames by elevation.
Tall Pallet Rack for 3PL Tenants
Selective first
Most 3PL tenants carry many clients and SKUs. Selective pallet racks keep every pallet reachable.
Pushback for depth
Clients with deep SKUs get pushback rack lanes, two to six deep.
Pallet flow for dated goods
Food and beverage clients needing FIFO get pallet flow rack.
Room to change
We leave flexibility so a suite can re-rack when clients change.
Airport West on Petersburg Rd
Cincinnati Logistics Park - Airport West sits on Petersburg Rd (KY-20). Its spec warehouses run 32 ft clear, roughly 6 miles west of CVG. The Graves Rd interchange on I-275 is the main access.
Spec buildings mean the tenant chooses the layout. We start with the truck you plan to run, because aisle width sets the position count. Reach trucks and narrow aisles change everything in tall space. We draw two or three aisle options so you see what each truck type adds before leasing or buying equipment for the new suite.
Pallet Rack Systems From Drawing to Install
- Floor plan and dock layout from the landlord or a sketch.
- CAD layout with every position counted.
- Itemized quote; lead time confirmed on paper.
- Install by experienced crews we schedule and manage.
- Winter snow and ice can slow deliveries, so dates carry slack.
Coming From an Older Building?
Many tenants move here from 20–24 ft space. Existing rack may be reused if the connection matches, plus taller frames to use the height. Our warehouse relocation service handles teardown and reinstall. Neighbors in Hebron face similar fit-outs. Reused frames rarely reach 36 ft, so most moves pair existing beams with new, taller uprights. We list every reused and new part on the quote, so the split is clear.
Lay Out Your New Burlington Suite
Share the floor plan. We draw rows and price them.
Burlington Pallet Rack FAQs
Nearby Service Areas
Lay Out Your New Burlington Suite
Share the floor plan. We draw rows and price them.